Installation and Setup
3-4 SM-1H1.0002, Rev. 1, July 2009
3.5. Verifying Installation
The TransPortal provides visual confirmation of connectivity and operation using a top panel
backlit LCD display and bi-color LED status indicators. See Figure 2-1.
3.5.1. Initialization
As the TransPortal powers up, the LCD top panel display typically shows the following;
TransPortal Remote
Monitoring Network
Ansalso-STS USA
Initializing
As part of the power up sequence, the TIM checks operation of the four bi-color LED status
indicators on the top panel of the unit. Each LED state is tested (OFF, Red, and Green).
3.5.2. Operation
Following initialization, the LCD display shows the IP addresses of the Ethernet connection
between the TIM (typically ETH1) and the host server. A typical display is shown below.
Eth1 IP Address
192.168.1.110
SNMP Host Address
192.168.1.111
During operation, only the Communication Status and System Status LED indicators are used in
this application. Table 3-1 describes the TIM status for each state of the active LED indicators
in this application.
Table 3-1. Active Top Panel LED Indicators
ACTIVE LED DESCRIPTION
Communication Status LED
Green
Connected to and communicating with
the MICROLOCK II controller
Red
M
ICROLOK II controller communication
link pre-empted or lost
Off Communication software not running
System Status LED
Green System software running
Red System software not running